• Português
  • English

Implementation and migration of PTC and Hexagon software

Full switchover in just 90 days with native connectivity, data integrity and TISAX governance.

90d

Accelerated go-live

TISAX

Data governance

ISO 9001

Compliance

// 05 — Productivity KPIs

Mapped ROI impact: productivity

driven by data and AI

────
+ 0 %

Higher productivity

Part rationalization and continuous component management in Windchill 13 (PLM).

- 0 %

Less modeling time

Geometry optimization and real-time simulation in Creo (CAD).

+ 0 %

Faster requirements creation

Automated validation and traceability in Codebeamer (ALM).

+ 0 %

Higher technical productivity

Field service efficiency and optimization with SLM/FSM (Servigistics).

PTC Partner Network

Understand the Implementation or Migration Process

Unify your entire product lifecycle (CAD, PLM, and ALM) by connecting mechanical and embedded software data into a single digital thread. Our R&D Center team migrates your legacy environment in just 30 days with encryption and cybersecurity certified under TISAX standards.

// 03 — Architecture face-off

The end of technology silos:

why traditional models fail

────

In traditional workflows, jumping from one software to another to complete a project comes with a high price tag. Within the PTC ecosystem, it doesn’t.

Traditional scenario • As-Is

Software separated by "walls"

Result: changes land late, forcing scrap, rework and inflating engineering costs.

OMC Integrated Ecosystem • OMC GROUP

A continuous data pipeline, one single Digital Thread

Continuous parametric flow

Result: the parametric 3D model evolves natively from concept design to manufacturing and service, with full data reuse across the lifecycle.

// 03 — Solution matrix

Certified ecosystem,

three technology pillars

────

Suíte PTC

Creo - CAD Software

Standardization & Design

  • Multi-CAD migration
  • DFM & parametric rules
  • -50% Modeling Time

Suíte PTC

Windchill 13 - PLM Software

Governance & Orchestration

  • End of “As-Is” silos
  • Super BOM management
  • +55% Productivity

Suíte PTC

Codebeamer - ALM Software

Traceability & Testing

  • End-to-End traceability
  • Requirements <-> 3D CAD
  • -53% Requirements Time

Implementation or Migration in 4 Steps

────

Our implementation model validates every step of the process directly In-Company with our senior engineering team, ensuring the implementation and/or migration process is as agile as possible. In just 4 stages, you start the month with newer, more modern software and fully trained teams.

Initial Assessment

Consultative pre-sale to map digital maturity (Industry 4.0) and design the ideal technical scope.

Implementation

Accelerated execution of legacy data migration and environment configuration (CAD/PLM/ALM) within 60 days.

Validation and Hypercare

Verification of native connectivity (Digital Thread) and dedicated post go-live support to ensure stability.

Workforce Onboarding

Practical operational training workshops based on agile methodology to maximize adoption.

// 03 — The physics of time-to-market

The earlier you migrate,

the lower the cost of change

────

In the traditional model, changes pile up in the late phases, manufacturing, pre-production and production exactly where every change costs exponentially more. Deploying OMC solutions early moves decisions back to product engineering and shortens time-to-market.

Traditional model • non-integrated tools

Siloed, Sequential Development

Cost of change   Change frequency

  • Siloed, sequential development
  • Multiple phases before production
  • Long time-to-market from sequential engineering
  • High development cost from late changes

With OMC • early migration

Collaborative Engineering Development

Cost of change  Change frequency  Cost in the previous model

  • Concurrent engineering, whole teams on the same file, at the same time
  • Better collaboration tools and a single source of data
  • Accelerated time-to-market
  • Lower development cost

Benefits of a Complete Implementation or Migration

────

While the traditional market requires 6 to 12 months to parameterize PLM/ALM systems, our technical team at the R&D Center executes the transition in just 2 months.

Legacy Project Migration

Your projects are migrated to the new PTC ecosystem and your team receives all necessary onboarding and training.

Guaranteed Interoperability

Total continuity in your operations without impacting any department, ensuring system-wide interoperability.

Your Team in a Single Ecosystem

Your workforce operates within a unified ecosystem, drastically reducing operational costs.

// 05 — Technical assessment

Ready to eliminate the cost of late-stage changes in your engineering?

Connect your operation to the elite arm of industrial technology and book a technical architecture session.

Solicitar diagnóstico

Reply within 24 business hours · OMC GROUP

Talk to a specialist

Talk to those who truly understand.